Tanzania
400kV/220kV/132kV/33kV Switchyard, Dodoma, Tanzania
400kV Switchyard, Dodoma
- Testing and Commissioning of 400/220/33 kV 250/250/85 MVA Auto TRANSFORMER- 2 No’s.
- Testing and Commissioning of 3Ø, 400/220/33 kV 250/250/85 MVA Shunt Reactor – 4 No’s.
- Testing and Commissioning of 400kV Current Transformer – 21 No’s.
- Testing and Commissioning of 400kV Capacitor Voltage Transformer – 18 No’s.
- Testing and Commissioning of 400kV Circuit Breaker– 11 Set’s.
- Testing and Commissioning of 400kV Disconnector – 26 Set’s.
- Testing and Commissioning of 400kV Lightning Arrester – 30 No’s.
- Testing and Commissioning of 400kV Bus Pole Insulator – 104 No’s.
- Commissioning of 400kV Differential & Stability Checked.
- Commissioning of 400kV C&R Panel, ACDB & DCDB Scheme, Control and Operation checked.
220kV Switchyard, Dodoma
- Testing and Commissioning of 220/33 kV 125/125/41.6 MVA Power TRANSFORMER- 2 No’s.
- Testing and Commissioning of 220kV Current Transformer – 12 No’s.
- Testing and Commissioning of 220kV Circuit Breaker– 4 Set’s.
- Testing and Commissioning of 220kV Disconnector – 8 Set’s.
- Testing and Commissioning of 220kV Lightning Arrester – 12 No’s.
- Testing and Commissioning of 220kV Bus Pole Insulator – 14 No’s.
- Commissioning of 220kV Differential & Stability Checked.
- Commissioning of 220kV C&R Panel, ACDB & DCDB Scheme, Control and Operation checked.
132kV Switchyard, Dodoma
- Testing and Commissioning of 132kV Current Transformer – 4 No’s.
- Testing and Commissioning of 132kV Lightning Arrester – 4 No’s.
- Testing and Commissioning of 132kV Neutral Reactor – 4 No’s.
33kV Switchgear, Dodoma
- Testing and Commissioning of 33kV Vacuum Circuit Breaker– 16 No’s.
- Testing and Commissioning of 33kV Current Transformer – 42 No’s.
- Testing and Commissioning of 33kV Lightning Arrester – 84 No’s.
- Testing and Commissioning of 33kV Potential Transformer – 12 No’s.
- Testing and Commissioning of 33kV 3Pole Earthing Switch – 14 No’s.
- Testing and Commissioning of 33kV Bus Pole Insulator – 12 No’s.
- Testing and Commissioning of 33/0.4kV Oil Cooled dry Type Transformer – 2 No’s.
- Commissioning of 33kV Differential & Stability Checked.
- Commissioning of 33kV ACDB & DCDB Scheme, Control and Operation checked
400kV/220kV/132kV/33kV Switchyard, Singida, Tanzania
400kV Switchyard, Singida
- Testing and Commissioning of 400/220/33 kV 250/250/85 MVA Auto TRANSFORMER- 2 No’s.
- Testing and Commissioning of 3Ø, 400/220/33 kV 250/250/85 MVA Shunt Reactor – 4 No’s.
- Testing and Commissioning of 400kV Current Transformer – 27 No’s.
- Testing and Commissioning of 400kV Capacitor Voltage Transformer – 24 No’s.
- Testing and Commissioning of 400kV Circuit Breaker– 15 Set’s.
- Testing and Commissioning of 400kV Disconnector – 36 Set’s.
- Testing and Commissioning of 400kV Lightning Arrester – 42 No’s.
- Testing and Commissioning of 400kV Bus Pole Insulator – 136 No’s.
- Commissioning of 400kV Differential & Stability Checked.
- Commissioning of 400kV C&R Panel, ACDB & DCDB Scheme, Control and Operation checked.
220kV Switchyard, Singida
- Testing and Commissioning of 220/33 kV 125/125/41.6 MVA Power TRANSFORMER- 2 No’s.
- Testing and Commissioning of 220kV Current Transformer – 12 No’s.
- Testing and Commissioning of 220kV Circuit Breaker– 4 Set’s.
- Testing and Commissioning of 220kV Disconnector – 8 Set’s.
- Testing and Commissioning of 220kV Lightning Arrester – 12 No’s.
- Testing and Commissioning of 220kV Bus Pole Insulator – 16 No’s.
- Commissioning of 220kV Differential & Stability Checked.
- Commissioning of 220kV C&R Panel, ACDB & DCDB Scheme, Control and Operation checked.
132kV Switchyard, Singida
- Testing and Commissioning of 132kV Lightning Arrester – 6 No’s.
- Testing and Commissioning of 132kV Neutral Reactor – 6 No’s.
33kV Switchgear, Singida
- Testing and Commissioning of 33kV Vacuum Circuit Breaker– 16 No’s.
- Testing and Commissioning of 33kV Current Transformer – 48 No’s.
- Testing and Commissioning of 33kV Lightning Arrester – 84 No’s.
- Testing and Commissioning of 33kV Potential Transformer – 12 No’s.
- Testing and Commissioning of 33kV 3Pole Earthing Switch – 14 No’s.
- Testing and Commissioning of 33kV Bus Pole Insulator – 12 No’s.
- Testing and Commissioning of 33/0.4kV Oil Cooled dry Type Transformer – 2 No’s.
- Commissioning of 33kV Differential & Stability Checked.
- Commissioning of 33kV ACDB & DCDB Scheme, Control and Operation checked.
Installation of 400kV Lemugur Substation in Tanzania, Africa
- Installation of 400 kV Circuit Breaker-10 sets
- Installation of 400 kV Circuit Breaker for Shunt Reactor- 4 set
- Installation of 400 kV Current Transformer- 42 No’s
- Installation of 400 kV Current Transformer for Shunt Reactor-12 No’s
- Installation of 400 kV Capacitive Voltage Transformer- 18 No’s
- Installation of 400 kV Lightning Arrestors- 30 No’s
- Installation of 400 kV Isolator with Earth Switch- 6 No’s
- Installation of 400 kV Isolator without Earth Switch- 24 No’s
- Installation of 400 kV Busbar od Aluminum Alloy Tube – 1 Lot
- Installation of 400 kV set of Bus supports, couplers, conductors, clamps, etc.,- 1 Lot
- Installation of 400 kV Conductors for strain Bus flexible connection to switchgear- 1 Lot
- Installation of 400 kV Post Insulator for busbar arrangements- 1 Lot
- Installation of Complete bay set of 400 kV Suspension and/ or Strain Insulator Strings- 1 Lot
- Installation of Complete bay set of 400 kV Conductors, clamps, Connectors, etc.,- 1 Lot
- Installation of 400 kV Terminal Cabinets with auxiliary device- 1 Lot
- Installation of Control and signaling panel for Incoming and outgoing 400 kV Line-shunt reactor bays- 1 Lot
- Installation of Control and signaling panel for 400 kV Transformer bays- 1 Lot
- Installation of Protection Panel for Incoming and outgoing 400 kV Line bays- 1 Lot
- Installation of Protection panel for 400 kV Shunt Reactor- 1 Lot
- Installation of Protection Panel for 400 kV Main Bus bay- 1 Lot
- Installation of Protection of 400 kV Transformer bays- 1 Lot
- Installation of Communication System- 1 Lot
- Installation of Digital Control and monitoring System- 1 Lot
- Installation of AC Auxiliary Services- 1 Lot
- Installation of DC Auxiliary Services- 1 Lot
- Installation of Substation Grounding- 1 Lot
Installation of 220kV Lemugur Substation in Tanzania, Africa
- Installation of 220kV Lightning Arrestors- 33 No’s
- Installation of 220kV Capacitive Voltage Transformer – 18 No’s
- Installation of 220kV Bus bar Isolator without earth switch – 21 No’s
- Installation of 220kV Line Isolator with earth switch – 4 No’s
- Installation of 220kV Bypass Isolator without earth switch – 4 No’s
- Installation of 220kV Current Transformer- 33 No’s
- Installation of 220kV Circuit Breaker-12 set
- Installation of 220kV set of bus supports, couplers, conductors, clamps, connections – 1 Lot
- Installation of 220kV conductors for strain bus flexible connection to switch gear – 1 Lot
- Installation of 220kV Complete bay support insulator strings and /or post insulators- 1 Lot
- Installation of 220kV Complete bay suspension and/or strain insulator strings- 1 Lot
- Installation of 220kV complete Line-Trap – 1 set
- Installation of 33kV Lightning Arrestors- 30 No’s
- Installation of 33kV XLPE cable from 220/33kv transformer to 33KV incomer -1 Lot
- Installation of 220kV Network interconnection-Additional works for BABATI 220KV substation control and protection panel – 1 Lot
- Installation of 220kV Network interconnection-Additional works for existing Arusha (NJIRO) 220KV substation control and protection panel – 1 Lot
- Installation of 220kV cabinets complete with auxiliary devices and terminals block – 1 Lot
- Installation of 220kV control and signaling panel for transformer bays – 1 Lot
- Installation of 220kV control and signaling panel for bus coupler bays – 1 Lot
- Installation of 220kV protection panel for incoming and outgoing – 1 Lot
- Installation of 220kV protection panel for shunt reactor bays – 1 Lot
- Installation of 220kV protection panel for main bus and bus coupler bays – 1 Lot
- Installation of 220/33kV protection panel for transformer bays – 1 Lot
- Installation of 220/33kV protection panel for power transformer bays – 1 Lot
- Installation of 220kV control and signaling for power transformer bays – 1 Lot
- Installation of 220kV communication system IP phones – 2 No’s
- Installation of 220kV communication system Telephone and coaxial cable – 1 Lot
- Installation of 220kV communication system travelling wave fault location system – 1 Lot
- Installation of 220kV substation grounding – 1 Lot
- Installation of 220kV shield wire system – 1 Lot
- Installation of 220kV miscellaneous lighting and low voltage power supply – 1 Lot
- Installation of 220kV miscellaneous LV, AC, DC multicore and auxiliary cables – 1 Lot
- Installation of 220kV miscellaneous embedded parts – 1 Lot
- Installation of 220kV miscellaneous Boxes for pad locks and keys – 1 Lot
Botswana
400/132/33kV Mawana Substation, Botswana
400kV Switchyard, Mawana
- Testing and Commissioning of 400/220 kV 125 MVA Auto TRANSFORMER- 2 No’s.
- Testing and Commissioning of 3Ø, 400kV 60 MVAr Reactor – 2 No’s.
- Testing and Commissioning of 400kV Current Transformer – 21 No’s.
- Testing and Commissioning of 400kV Capacitor Voltage Transformer – 12 No’s.
- Testing and Commissioning of 400kV Circuit Breaker– 7 Set’s.
- Testing and Commissioning of 400kV Isolator with Earth switch – 10 set’s.
- Testing and Commissioning of 400kV Isolator without Earth switch – 5 set’s
- Testing and Commissioning of 400kV Earth switch – 4 set’s.
- Testing and Commissioning of 400kV Neutral Grounding Reactor – 1 No’s.
- Testing and Commissioning of 400kV Pantograph Isolator – 1 Set.
- Testing and Commissioning of 400kV Lightning Arrester – 15 No’s.
- Commissioning of 400kV Differential & Stability of Transformer and Switchyard Checked.
- Commissioning of 400kV C&R Panel, ACDB & DCDB Scheme, Control and Operation checked.
220kV Switchyard, Mawana
- Testing and Commissioning of 400/132 kV 80 MVA Auto TRANSFORMER- 2 No’s.
- Testing and Commissioning of 220kV Current Transformer – 21 No’s.
- Testing and Commissioning of 220kV Capacitor Voltage Transformer – 18 No’s.
- Testing and Commissioning of 220kV Circuit Breaker– 7 Set’s.
- Testing and Commissioning of 220kV Isolator with Earth switch – 10 set’s.
- Testing and Commissioning of 220kV Isolator without Earth switch – 6 set’s.
- Testing and Commissioning of 220kV Earth switch – 4 set’s.
- Testing and Commissioning of 220kV Pantograph Isolator – 1 Set.
- Testing and Commissioning of 220kV Lightning Arrester – 15 No’s.
- Commissioning of 220kV Differential & Stability of Transformer and Switchyard Checked.
- Commissioning of 220Kv C&R Panel, ACDB & DCDB Scheme, Control and Operation checked
132kV Switchyard, Mawana
- Testing and Commissioning of 132kV Current Transformer – 21 No’s.
- Testing and Commissioning of 132kV Capacitor Voltage Transformer – 24 No’s.
- Testing and Commissioning of 132kV Circuit Breaker– 7 Set’s.
- Testing and Commissioning of 132kV Isolator with Earth switch – 12 set’s.
- Testing and Commissioning of 132kV Isolator without Earth switch – 8 set’s.
- Testing and Commissioning of 132kV Earth switch – 2 set’s.
- Testing and Commissioning of 132kV Pantograph Isolator – 3 Set’s.
- Testing and Commissioning of 132kV Lightning Arrester – 15 No’s.
- Testing and Commissioning of 132kV Line Trap – 3 No’s.
- Commissioning of 132kV Differential & Stability of Transformer and Switchyard Checked.
- Commissioning of 132kV C&R Panel, ACDB & DCDB Scheme, Control and Operation checked.
33/11 kV Switchgear, Mawana
- Testing and Commissioning of 33kV Circuit Breaker– 2 No’s.
- Testing and Commissioning of 33kV Isolator with Earth switch – 2 set’s.
- Testing and Commissioning of 33kV Neutral Earthing Compensator – 2 No’s.
- Testing and Commissioning of 33kV Lightning Arrester – 18 No’s.
- Testing and Commissioning of 33kV Voltage Transformer – 21 No’s.
- Testing and Commissioning of 3Ø, 33kV, 25 MVAr Reactor – 2 No’s.
- Testing and Commissioning of 11kV Neutral Earthing Compensator – 2 No’s.
- Commissioning of 33kV Differential & Stability Checked.
110V Battery Bank, Mawana
- Charging and Discharging test for 110V Battery Bank.
- Charging and Load test, Alarm, Indication and Scheme Checked for 110V Battery Bank.
Malawi
400/132/33kV SUB – STATION OF PHOMBEYA & NKHOMA IN MALAWI
- Testing & Commissioning of 400kV Circuit Breaker – 6 Set’s.
- Testing & Commissioning of 400kV Pantograph Isolators with Earth Switch – 6 Set’s.
- Testing & Commissioning of 400kV HCB Isolators – 10 Set’s.
- Testing & Commissioning of 400kV Current Transformer – 6 Set’s.
- Testing & Commissioning of 400kV Capacitive voltage transformer – 4 Set’s.
- Testing & Commissioning of 400kV Lightning Arrester – 6 Set’s.
- Testing & Commissioning of 400kV BUS Reactor (50 MVAR) – 2 No’s.
- Testing & Commissioning of 400/132/33kV 66.67 MVA ICT Single Phase Transformer – 8 No’s.
- Testing & Commissioning of 400kV Switchyard.
- Testing & Commissioning of 400kV CRP Panel – 8 No’s.
- Stability Test of 400kV BUS Reactor (50 MVAR) – 2 No’s.
- Stability Test of 400/132/33kV ICT Single Phase Transformer – 8 No’s.
- Stability Test of 400kV Switchyard.
- Testing & Commissioning of 132kV Circuit Breaker – 15 Set’s.
- Testing & Commissioning of 132kV HCB Isolators – 43 Set’s.
- Testing & Commissioning of 132kV Current Transformer – 15 Set’s.
- Testing & Commissioning of 132kV Capacitive voltage transformer – 15 Set’s.
- Testing & Commissioning of 132kV Lightning Arrester – 13 Set’s.
- Testing & Commissioning of 132kV Switchyard.
- Testing & Commissioning of 132kV CRP Panel – 17 Bay’s.
- Stability Test of 132kV Switchyard.
- Testing & Commissioning of 33kV Circuit Breaker – 2 Set’s.
- Testing & Commissioning of 33kV HCB Isolators – 2 Set’s.
- Testing & Commissioning of 33kV Current Transformer – 2 Set’s.
- Testing & Commissioning of 33kV Switchyard Stability Test of 33kV Swich Yard
- Testing & Commissioning of 33kV/415V Station transformer Rating 1600KVA Dyn-11 – 4 No’s.
- Testing & Commissioning of 33kV CRP Panel – 2 No’s.
- Testing & Commissioning of 415V DIESEL GENERATOR – 2 No’s.
- Testing & Commissioning of 33kV Switch Gear Board Current Transformer – 16 Set’s.
- Testing & Commissioning of 33kV Switch Gear Board Potential Transformer – 4 Set’s.
- Testing & Commissioning of 33kV Switch Gear Board Circuit Breaker – 10 Set’s.
- Testing & Commissioning of 110V DC Battery Bank – 4 Bank’s
- Testing & Commissioning of 110V DC Battery Charger – 4 No’s.
66/33/11kV SUB-STATION OF BLANTYRE, MALDECO LIWONDE, ZOMBA, THYOLO A, THYOLO B, LIMBE B, NTONDA, DAVID WHITE (UGC – 2) MALAWI
- Testing & Commissioning of 66kV Circuit Breaker – 01 No.
- Testing & Commissioning of 66kV Isolators – 01 No.
- Testing & Commissioning of 66kV CRP Panel – 1 No.
- Testing & Commissioning of 33kV Circuit Breaker – 23 Set’s.
- Testing & Commissioining of 33kV Current Transformer – 22 Set’s.
- Testing & Commissioning of 33kV Isolators without Earth Switch – 36 Set’s.
- Testing & Commissioning of 33kV Potential Transformer – 11 Set’s.
- Testing & Commissioning of 33kV Lightning Arrestor – 15 Set’s.
- Testing & Commissioning of 33kV Insulator – 24 Set’s.
- Testing & Commissioning of 33kV/415V Auxiliary Transformer – 8 No’s.
- Testing & Commissioning of 33kV CRP Panel – 22 No’s.
- Stability Test of 33kV Transformer – 9 No’s.
- Stability Test of 33kV Switchyard
- Testing & Commissioning of 11kV Switch Gear Circuit Breaker – 28 No’s.
- Testing & Commissioning of 11kV Switch Gear Current Transformer – 28 Set’s.
- Testing & Commissioning of 11kV Switch Gear Potential Transformer – 6 Set’s.
Ethiopia
400/230/15kV SUB STATION- DEBREZEIT III ETHIOPIA EAST AFRICA
- Testing & Commissioning of 400kV GE Alstom make CB – 7 Set’s.
- Testing & Commissioning of 400kV GE T&D make CT – 7 Set’s.
- Testing & Commissioning of 400kV GE T&D make CVT – 6 Set’s.
- Testing & Commissioning of 400kV Lighting Arrestor – 7 Set’s.
- Testing & Commissioning of 400kV GE T&D Pantograph Type Disconnector – 17 Set’s.
- Testing & Commissioning of 400kV Earth Switch – 3 Set’s.
- Testing & Commissioning of 250MVA 400/230kV Transformer – 2 No’s.
- Testing & Commissioning of 400kV CRP Panels.
- Power Transformer Body Protection Wiring & Functional Operations Checked.
- RTCC & OLTC Wiring & Functional operation Checked.
- Testing & Commissioning of 230kV GE Alstom make CB – 7 Set’s.
- Testing & Commissioning of 230kV GE T&D make CT – 7 Set’s.
- Testing & Commissioning of 230kV GE T&D make CVT – 6 Set’s.
- Testing & Commissioning of 230kV Lighting Arrestor – 7 Set’s.
- Testing & Commissioning of 230kV GE T&D Pantograph Type Disconnector – 17 Set’s.
- Testing & Commissioning of 230kV Earth Switch – 3 Set’s.
- Testing & Commissioning of 50MVA 230/15kV Transformer – 2 No’s.
- Testing & Commissioning of 230kV CRP Panels.
- Power Transformer Body Protection Wiring & Functional Operations Checked.
- RTCC & OLTC Wiring & Functional operation Checked.
- Transformer & Bus Bar Stability done.
- 230kV Two Main Bus with Bus coupler Scheme Interlock Checked(On Load).
- Testing & Commissioning of 15kV Switchgear panel PT,CT,CB,Disconnector, E/S, LA – 20 No’s.
- 15kV Two Main Bus with Bus coupler Scheme Interlock Checked.
230/15kV SUB STATION– DUKEM II ETHIOPIA EAST AFRICA
- Testing & Commissioning of 230kV GE Alstom make CB – 5 Set’s.
- Testing & Commissioning of 230kV GE T&D make CT – 5 Set’s.
- Testing & Commissioning of 230kV GE T&D make CVT – 4 Set’s.
- Testing & Commissioning of 230kV Lighting Arrestor – 4 Set’s.
- Testing & Commissioning of 230kV GE T&D Pantograph Type Disconnector – 12 Set’s.
- Testing & Commissioning of 230kV Earth Switch – 4 Set’s.
- Testing & Commissioning of 50MVA 230/15KV Transformer – 2 No’s.
- Testing & Commissioning of 230kV CRP Panels.
- Power Transformer Body Protection Wiring & Functional Operations Checked.
- RTCC & OLTC Wiring & Functional operation Checked.
- Transformer & Bus Bar Stability done.
- 230kV Two Main Bus with Bus coupler Scheme Interlock Checked(On Load).
- Testing & Commissioning of 15kV Switchgear panel PT ,CT ,CB , Disconnector, E/S, LA – 16 No’s.
- 15kV Two Main Bus with Bus coupler Scheme Interlock Checked.
230/15kV SUB STATION– MODJO II ETHIOPIA EAST AFRICA
- Testing & Commissioning of 230kV GE Alstom make CB – 4 Set’s.
- Testing & Commissioning of 230kV GE T&D make CT – 4 Set’s.
- Testing & Commissioning of 230kV GE T&D make CVT – 3 Set’s.
- Testing & Commissioning of 230kV Lighting Arrestor – 3 Set’s.
- Testing & Commissioning of 230kV GE T&D Pantograph Type Disconnector – 9 Set’s.
- Testing & Commissioning of 230kV Earth Switch – 3 Set’s.
- Testing & Commissioning of 50MVA 230/15kV Transformer – 2 No’s.
- Testing & Commissioning of 230kV CRP Panels.
- Power Transformer Body Protection Wiring & Functional Operations Checked.
- RTCC & OLTC Wiring & Functional operation Checked.
- Transformer & Bus Bar Stability done.
- 230kV Two Main Bus with Bus coupler Scheme Interlock Checked(On Load).
- Testing & Commissioning of 15kV Switchgear panel PT, CT, CB, Disconnector, E/S, LA – 16 No’s.
- 15kV Two Main Bus with Bus coupler Scheme Interlock Checked.
Djibouti
12 MVA, 66/20 kV POWER TRANSFORMER, DJIBOUTI, EAST AFRICA
- Testing and Commissioning of 63/20 kV 10/12 MVA TRANSFORMER AMF-001 ABB – 1 No.
- Testing and Commissioning of 63/20 kV 10/12 MVA TRANSFORMER AMF-002 ABB – 1 No.
- Testing and Commissioning of 1.5 MVATRAFO SCHNEIDER ELECTRIC – 7 No’s.
- Testing and Commissioning of 100 KVA transformer – 1 No.
Libya
- Protection Relay 1372 No’s & Annual Shutdown Works LISCO
Sierra Leone
32MW CAPTIVE POWER PLANT
ADDAX BIO ENERGY- SIERRA LEONE – WEST AFRICA
- Testing and Commissioning of 32MW Alternator.
- Testing and Commissioning of Neutral Side CT and Phase Side CT.
- Testing and Commissioning of LAPT.
- Testing and Commissioning of Exciter and Excitation Transformer.
- Testing and Commissioning of Bus Duct.
- Stability test was done for Alternator.
- Modification was done in BFP Motor Panel.
- Modification was done in RDOL Starter.
- Co-ordination with Client and Customer to Modify Schematic in HT panel, LT panels and VFD.
- Commissioning of TG & TG CB @ Dead bus mode.
- LT Breakers commissioning Assistance.
Uganda
14.9MW SUGAR PLANT & 33/11kV SUBSTATION, KALIRO, UGANDA SUGAR AND ALLIED INDUSTRIES LTD – UGANDA – EAST AFRICA
- T & C Of 33kV Switchyard.
- T & C Of 11kV HT Panel Switchgear.
- T & C Of 11kV CBCT & Auxiliary relay.
- T & C Of 33/11kV Relay panel Auxiliary Relay & Alternator Auxiliary Relay Testing done for GRP,MCSP,TRP Panels.
- T & C Of 10MVA Power Transformer.
- T & C Of Auxiliary Transformer CO –Generation(2.5MVA).
- T & C Of Mill Trafo-1 (1.25MVA) Mill Trafo-2 (1.25 MVA).
- T & C Of Boiling House Transformer-1 (1.6MVA).
- T & C Of 2.5MVA DT Incomer, 1MVA TG Incomer & 1MVA DT Incomer CT.
- Differential and REF Stability tested for 10MVA Power Transformer.
- 11kV HIGH VOLTAGE test Completed for 11kV Switch Gear BUS,O/G & I/C Cables.
- HIGH VOLTAGE test Completed for 33kV & 11kV Power Transformer Cables,14.9 MW 11kV Generator Cable & 11kV LAVT Panel Cables, NGR Cables.
- Alternator PI Value Measured & Alternator Differential Stability Tested.
- Configuration, Testing and Commissioning of Generator Protection Relay .
- Areva – P341,Line Protection
- Relay Areva – P442, Areva – P632, Directional/ Non Directional Relay Areva – P127
Jordan
30MW MCM CAPTIVE POWER PLANT, AMMAN, JORDAN
- Testing and Commissioning of 32MW Generator.
- Testing and Commissioning of 11kV Switchgear Make ABB with 18 Vertical’s.
- Testing and Commissioning of 415V Switchgear Make ABB – 10No’s.
- Testing and Commissioning of 415V VFD Panel Make ABB – 8No’s.
- Testing and Commissioning of 2 MVA Diesel Generator Make Powerica – 2No’s.
- Testing and Commissioning of Generator Transformer (40MVA) – 1No.
- Testing and Commissioning of Auxiliary Transformer (2MVA) – 6No’s.
- Co-ordination with Client and Customer to Modify Schematic in HT panel, LT panels and VFD Panel.
- Co-ordination with Client and Customer to Upgrade Schematic and Modify Interlocks between Captive power plant, Cement Plant and NEPCO.